National motorway construction programme
Task holders
Spatial planning
Built motorways and expressways
Motorway system in construction
Management and maintenance
Environmental aspect
 

Built motorways and expressways

Table below shows the construction* pace of individual sections of motorways (MW), expressways (EW) and other public roads (PR):
  • from 1970 to 1994 and 
  • from 1.1.1994 to the end of 2011 in line with the  National motorway construction programme (NPIA)
Section of motorway, expressway or other public road Lenght in km Beginning Completion
Peračica - Podtabor (part of MW section) 2,4 2005
29.11.2007 (I phase)
27.10.2011 (II. phase) - reconstruction of the right lane 
AC Pluska - Hrastje 14.8 2007 30.6.2010
A4 Draženci-Gruškovje, subsection PR MMP Gruškovje -border with Croatia (categorised as G1-9) 0.56 2007 17.12.2009
subsection Pesnica - Ptujska c., MW section Pesnica - Slivnica
subsection Pesnica - Zrkovska c., MW section Pesnica - Slivnica
subsection Ptujska c. - Slivnica, MW section Pesnica - Slivnica
9.5
1.0
4.1
2002
2006
1998
14.8.2009
30.5.2008
22.5.2000
subsection Razdrto - Podnanos (Rebernice), EW section Razdrto - Vipava
subsection Podnanos - Log, EW section Razdrto - Vipava
subsection Log - Vipava, EW section Razdrto - Vipava
split Razdrto, EW section Razdrto - Vipava
10.0
2.6
3.4
1.6
2002
1998
2002
2000
13.8.2009 
20.12.2003
1.10.2001
24.11.2000
subsection PR Nova Zrkovska c., 2. stage, 2. phase
subsection PR Nova Zrkovska c., 2. stage, 1. phase
subsection PR Nova Zrkovska c., 1. stag
1.8
1.0
0.9
2006
2006
1999
14.9.2009
15.12.2006
18.9.2000 
Slivnica - Draženci, MW section 19.8 2007 16.7.2009
Lenart  - Vučja vas, MW section  26 2006 30.10.2008
Vrba - Peračica, MW section  9.8 2006 22.9.2008
Lendava-Pince, MW section  13.7 2006 19.8.2008
EW Lendava-Dolga vas-Hungary border  2.8 2006 14.8.2008
Beltinci-Lendava, MW section  17.4 2006 14.8.2008
Šentvid - Koseze, MW section  5.5 2004 1.7.2008
Lešnica - Kronovo, part of MW section  5.5 2006 23.6.2008
Lenart - Sp.Senarska, part of MW section  2.2 2006 30.5.2008
Maribor - Lenart, MW section  7.8 2006 30.5.2008
navezava na Luko Koper, PR section  3.1 2005 15.4.2008
priključek/junction road Lendava (two lane road)  1.2 2006 21.12.2007
Hajdina - Ptuj (two lane road) PR section  2.4 2007 18.5.2007
junction road Celje-vzhod (Ljubečna), MW section  1.9 2006 8.12.2006
Hrastje - Lešnica, MW section  7.8 2004  23.6.2006 
Slavček - Tomos, PR section  1.0 2004  29.11.2005 
Korenitka - Pluska, MW section    3.0 2004  23.12.2004 
Smednik - Krška vas, MW section  17.6 2003 
(partially 11.12.2004)
23.12.2004 - entirely
bypass Pragersko (two lane road), PR section    6.1 2003  8.12.2004 
Škofije - Srmin, EW section    2.4 2003 
(partially 22.10.2004)30.8.2005 - entirely
Klanec - Črni Kal - Srmin, MW section    14.9 2001 
partially 23.9.2004)25.11.2004 - entirely
connection Ljubljana Brdo - Lesnina, PR section        1.0 2003  8.12.2004 
Krška vas - Obrežje, MW section  12 2002  4.11.2004 
Hoče - Arja vas, MW section; junction road Lopata    3.6 2003  22.7.2004 
Kronovo - Smednik, MW section    9.2 2002  2.7.2004 
Bič - Korenitka, MW section    4.8 2002  22.12.2003
Podtabor - Naklo, MW section    4.3 2001  4.9.2003 
Ljubljana - Koper, MW section, connection road Razdrto    0.9 2001 1.3.2003 
Vučja vas - Beltinci, MW section, junction road  3.4 2000  15.11.2002 
Vučja vas - Beltinci, MW section  11.2 2000 
(partially 15.11.2002)30.10.2003 - entirely
Vransko - Blagovica, MW section  16.8 1997 
(partially 28.6.2002)12.8.2005 - entirely
Šmarje - Dragonja (1., 2. in 3. stage), PR section     2.6
1999
(2000)
(2002)
(partially 8.6.1999 in 22.6.2000)25.3.2003 - entirely
bypass Novo mesto (1. in 2. stage), PR section  3.0
1998
(1999) 
(partially 10.11.1999)24.11.2001 - entirely
Mele - Šratovci - Radenci, PR section  2.8 1998  31.7.1999 
Mariborska road in Celje (1., 2., 3. in 4. stage), PR section  3.0
1998
(2000)
(2003)
(2005)
(partially 18.7.1999, 5.9.2000, 4.9.2004)27.6.2006 - entirely
Maribor west by pass (Fontana - Turnerjeva 800m; most - Erjavčeva 1.150m; Erjavčeva - Cesta Proletarskih brigad 780; Cesta Proletarskih brigad - Streliška c. 980m), public road  3.71
1998
(2000)
(2003)
(2007)
(7.5.1999, 2.7.2002, 25.11.2004, 3.6.2009)
EW through Maribor, 2.B stage  2.6 2000  26.10.2001 
Blagovica - Šentjakob, MW section  20.3
1998
(2000)
(2002)
(partially 28.8.2001 in28.6.2002)
1.7.2003 - entirely
Kozina - Klanec, MW section  4.8 1999  24.11.2000 
Naklo - Kranj, MW section  8.7 1998  21.11.2000 
Višnja Gora - Bič, MW section  11.2 1998  3.10.2000
Vipava - Selo, EW section  11.5 1997  25.10.1999 
Šentjakob - Malence (eastern bypass of Ljubljana), MW section  10.7 1995   
(partially 16.11.1998)27.8.1999 - entirely
Slov. Bistrica - Hajdina, junction Slov.Bistrica - bypass Pragersko, PR section  3.5 1999  1.7.1999
Beltinci -  Pince, MW section, subsection bypass Lendava (two-lane road)  6.8 1997  31.7.1999 
Izola - Jagodje (3,6 km), EW section  2.3 1998  11.6.1999 
Zadobrova - Tomačevo (northern bypass of Ljubljana), EW section  4.3 1995 
(partially 30.10.1996)16.11.1998 - entirely
Hajdina - Ormož (30 km), subsection bypass Ormož (two lane road), PR section  3.8 1997  11.9.1998 
Slivnica - Fram - BDC, MW section  7.0 1997 
(partially 24.10.1997)31.5.1998 - entirely
Divača - Kozina, MW section  6.7 1997  27.3.1998 
AC Dane - Fernetiči, MW section  3.8 1995  14.11.1997 
Slovenska Bistrica - Hajdina (14,1 km), junction road Slovenska Bistrica north (two lane road), PR section  0.8 1997  29.9.1997 
Arja vas - Vransko, MW section  20.9 1995  19.9.1997 
Hoče - Arja vas, MW section  47.0 1994 25.10.1996
Mejni prehod Šentilj - Pesnica, MW section  9.5 1994  18.10.1996 
Selo - Šempeter, EW section  11.8 1994  24.5.1996 
Divača - Dane, MW section  8.4 1994  8.12.1995 
Čebulovica - Divača, MW section  5.1 1994  12.7.1995 
Razdrto - Čebulovica**, MW section  8.8 1994 12.7.1995
Hrušica - Vrba, MW section  13.5 1989 18.10.1993
Malence – Šmarje Sap, MW section  6.3 1989 24.11.1992
border with Austria - Šentilj, MW section  1.2 1989 18.9.1991
border with Austria (tunnel Karavanke) - Hrušica, MW section  1.9 1986 1.6.1991
Karavanke tunnel (Slovenian part)  3.4 1986 1.6.1991
Ankaran - Koper, EW section 6.5   7.1.1990
Razdrto – Senožeče (part of Razdrto – Čebulovica section) with split Nanos, MW section  1.7 1989 22.8.1990
Šmarje Sap – Višnja Gora, MW section  11.8 1987 12.7.1989
Pesnica – Maribor (III. phase of EW through Maribor)  4.6 1987 30.6.1989
Kozarje – Malence (Ljubljana southern bypass), MW section  7.5 1979 28.10.1988
Kranj - LJ Šentvid, MW section, MW section  20 1983  26.6.1985
Naklo - Kranj East, MW section  5.7 1983 26.6.1985
Tomačevo – Celovška (first phase of Ljubljana northern bypass), EW section  5.7 1981  29.11.1983
Koseze – Kozarje (Ljubljana western bypass),MW section  4.7 1979  12.11.1981 
LJ (Celovška - Koseze), EW section 5.3 1979 12.11.1981
LJ (Tomačevo - Celovška road), EW section 3.8 1981 29.11.1983
Črnuče - Tomačevo, EW section 2.5 1979  12.11.1981 
Vrtojba - border with Italy 0.7   17.6.1980
Maribor – Tezno (phase I. in II. of EW through Maribor)  2.7
1978
(1980)
dec.79
(19.06.1985)
Dolgi most (Ljubljana) - Vrhnika, MW section  12.4 1976 21.9.1979
Hoče – Arja vas (two lane), MW section  51 1972 (1975) 
21.7.1976(19.12.1977)
Postojna - Razdrto, MW section  11.1 1972 14.9.1974 
Vrhnika - Postojna, MW section  30.1 1970  29.12.1972

*The section of construction represents the lenght of the constructed line and its momentary joint roads to the current network or sometimes even a junction road, which was built in connection with the investment to the praticular section of construction. The lenght of the sections of construction cannot be summed up into the lenght of the categorised road.


** within the realisation of NPIA, only two viaducts were built on the MW section Razdrto - Čebulovica (Bandera in Goli vrh), the MW section was built before NPIA.

NOTE: gray coloured MW in EW were built after 1994 within the NPIA.

MW and EW built until 1994:

  • four lane MW and EW: 139.3 km
  • two lane roads: 59.1 km

From 1994 till now 528 km of motorways, expressways and other public roads were built.


TRAFFIC
 
Photo-gallery
INFO


Enter your data:
* Name and surname:
Address:
Postal num.:
City:
* Email:
Phone:
* Subject:
* Message:
Attachment:
Maximum file size is 10Mb.
Fields marked with *, are required.
Copy the code:
Send
Close